pilipiliÂþ»­

 

Today@Dal

» Go to news main

Medjuck and DaCosta row Roadway Paving Repairs

Posted by Faculty of Engineering on June 23, 2021 in General Announcements

Foot and vehicle traffic on Sexton campus should be aware of upcoming upgrades to curbs, roads, and sidewalks on the Sexton campus from JuneÌý23 to July 30. The affected area includes DaCosta row (between the roundabout and the intersection with Norma Eddy Lane) and the footpaths in front of the Medjuck building.

​If there are questions or concerns, please contact Liane Sandula atÌýLiane.Sandula@dal.ca

Ìý